How quickly can I charge my car at a charging station?
You can calculate this with a simple calculation: divide the capacity of the battery by the capacity of the charging station.
Example:
Suppose your car has a 55 kWh battery and the charging station has a capacity of 11 kW. Then it takes about 5 hours (55 kWh / 11 kW = 5 hours) for a completely empty battery to be fully charged again. Your meter cupboard must therefore have the capacity to charge 11 kW. A 1-phase meter cupboard can usually supply a maximum of 3.7 kW per group. For 11 kW charging you need a 3-phase meter cupboard.
What type of plug does my car have?
A Type 1 plug is also called a Yazaki plug. This connection is used for charging with alternating current (AC), up to a maximum power of 3.7 kW. Type 1 is mainly used on American and Japanese cars before 2014.
Type 2 is more commonly referred to as Mennekes or VDE-AR-E_2623-2-2. In 2014, it was designated as the standard for alternating current (AC) charging of electric vehicles. All new electric cars sold in Europe since then have been equipped with this connector.
Is my house suitable for a wallbox?
In fact, every home is suitable for a charging station. No permits are required to have your own charging station installed. Let our professionals advise you on the possibilities.
Is charging via solar panels possible?
Of course! The energy generated by solar panels can also be used to charge your electric car. What’s more, it costs next to nothing and can save you a lot on your energy bill. Voltero can also help you with the installation of solar panels and energy storage systems.
How can I charge with 3 phases?
3-phase charging is possible if you have a main connection of at least 3 x 25 Amp. With 3 phase it is possible to charge your car between 11 and 22 kWh. A fully electric car can then be fully charged again within a few hours, depending on the battery pack. No 3 phase in the house? Voltero can help you with the preparations in the meter cupboard.
Can Voltero supply and install a charging station?
Yes, Voltero is NEN 1010 & 3140 certified and can deliver and install a charging station at your home. This can be on the wall or on a pole, for example.
Within what time frame will the charging station be installed?
Your charging station can be installed at your home within 4 weeks.
How is the price for installation determined?
This is partly due to the following factors:
- The distance between the charging station and the meter cupboard
- To carry out ground and road works
- Any adjustments to the meter cupboard